Colocation in Seoul, built your way
Run your own systems, storage and network in carrier-neutral data centers in Seoul.
Configure rack space and power
Choose a data center, rack size and extra power. Prices are the same at every site.
Monthly estimate
KINX Gasan · Geumcheon-gu, Seoul
- Quarter rack · 11U
- ₩350,000
- Extra power · None
- ₩0
- Total power
- 0.55 kVA
VAT excluded. Setup fees and contract terms are confirmed in your quote.
Request a quoteThree Tier III data centers in Seoul
Compare power per rack, redundancy, carriers and nearby network by site.

KINX Gasan
Gasan-dong, Geumcheon-gu, Seoul
16kWPower per rack
- Power and cooling
- N+1 redundant
- Certification
- Tier III
- Carriers
- 10+
- PoP code
- ICN05
- Rack sizes
- Quarter 11U, Third 15U, Half 23U, Full 47U
- Key features
- KINX-IX direct connection
- 5 min walk from Gasan Digital Complex Station (Line 7)
- Direct peering with major ISPs
Exact addresses are shared during the site tour and quote. Building photos are illustrative.
Rack sizes and connections by site
See the rack sizes and Cross Connect cable types available at each site.
- Available
- Not offered
| Service | KINX Gasan | KINX Dogok | Netreality SL1 |
|---|---|---|---|
| Rack space | |||
| Quarter · 11U | Available | Not offered | Available |
| Third · 15U | Available | Not offered | Available |
| Half · 23U | Available | Not offered | Available |
| Full · 47U | Available | Available | Available |
| Connections | |||
| Cross Connect | SMF only | SMF only | SMF, MMF, Cat6 |
| Metro Connect | Available | Available | Available |
| Cloud Connect | Available | Available | Available |
| IP Transit | Available | Available | Available |
Included with every rack
Security, power, cooling and base power come with every rack. Add extra power and other services when you need them.
Included
- 24/7 security and monitoringRound-the-clock physical security and video surveillance
- N+1 power and coolingRedundant power with UPS backup
- Base power0.55 to 2.2 kVA by rack size
- Remote handsOn-site staff for installation, cabling and hardware swaps on request
Add-ons
- Smart HandsOn-site technical work for installation, cabling, inspection and troubleshootingPrice on request
- In & Outbound ShippingInbound and outbound equipment handling, packaging and storagePrice on request
- Extra powerIn 1.1 kVA steps, up to +5.5 kVA₩180,000/month each
Cage
A dedicated space for 8 or more full racks.
- Bring your own rack (BYOR)
- Custom power
- Dedicated security zone
Custom quote
Contact SalesNetwork connections
Add the links you need, from the same building to other data centers and the cloud.
- Your rackColocation at KINX Gasan, KINX Dogok or Netreality SL1
- Cross ConnectL1 physical link inside the same data center
- Metro ConnectL2 link between Seoul metro data centers, up to 100 Gbps
- Cloud ConnectPrivate links to AWS, Azure, Google Cloud and Oracle Cloud
- IP TransitBGP internet over the PacketStream backbone
Built for dense, always-on hardware
- 44kW
- Up to 44kW per rack for AI and HPC workloads
- 99.99%
- SLA, backed by N+1 power and cooling
- ISO 27001SOC 2 Type IIPCI DSS
- Certifications
44kW is the documented maximum at Netreality SL1; KINX sites list 16kW per rack.
Frequently asked questions
What is Colocation?
Colocation lets you install and run your own servers and network equipment in a secure data center. We provide physical security, power, cooling and network connectivity, so you can focus on your equipment.
Which data centers are available?
KINX Gasan, KINX Dogok and Netreality SL1, all Tier III certified data centers in Seoul. All of them connect directly to major ISPs. KINX Dogok offers Full racks only.
How is power provided?
Power is N+1 redundant with UPS backup. Quarter racks get 2.5A, Third 3.5A, Half 5A and Full 10A by default, and power can be expanded up to 44 kW for high-density workloads.
How do I connect to the network?
Use Cross Connect inside the data center, Metro Connect between data centers, Cloud Connect to public clouds and IP Transit for internet access. The sites are carrier-neutral, so you can choose any carrier.
What does Colocation cost?
Quarter ₩350,000, Third ₩480,000, Half ₩650,000 and Full ₩1,100,000 per month, VAT excluded. A cage of 8 or more full racks is custom quoted. Cooling, security and base power are included; extra power is billed separately.
More in Infrastructure
Cross Connect
Physical links within a data center
Learn more about Cross ConnectMetro Connect
Layer 2 across Seoul metro data centers
Learn more about Metro ConnectCloud Connect
Private links to public clouds
Learn more about Cloud Connect
Ready to get started?
Tell us about your workload and we will help you choose the right products and plans.
